The Longest Tunnels in the World

New York's Delaware Aqueduct runs about 137 kilometres. Gotthard is the longest operating railway tunnel; compare water, rail and road tunnels.

What is the longest tunnel in the world?

The longest tunnel in the world, using New York City’s description of its water-supply infrastructure, is the Delaware Aqueduct, approximately 137 kilometres long. For an operating railway tunnel, the answer is Switzerland’s 57.1-kilometre Gotthard Base Tunnel. Water, trains and road traffic belong to different record categories.

This comparison was checked in November 2026. It measures the length of a named route or main tunnel, rather than adding together every parallel bore, service passage and construction access tunnel. Water-supply structures are included and labelled.

Longest tunnels compared by route length

The table orders selected major water and transport tunnels by length. It is a category-spanning comparison, not an exhaustive worldwide list of every aqueduct, mine passage or connected metro route. Years identify opening or an explicitly labelled source date.

Rank among listed tunnels Tunnel Main route length (km) Purpose Year Status
1 Delaware Aqueduct, USA About 137 Water supply 1944: entered service Existing system; repair project
2 Paijanne Tunnel, Finland 120 Water supply 1982: commissioned Operating
3 Gotthard Base Tunnel, Switzerland 57.1 Railway 2016: commissioned Operating
4 Seikan Tunnel, Japan 53.85 Railway 1988: opened Operating
5 Channel Tunnel, UK–France About 50.5 Railway 1994: inaugurated Operating
6 Lotschberg Base Tunnel, Switzerland 34.6 Railway 2007: opened Operating
7 Laerdal Tunnel, Norway 24.509 Road 2000: opened Existing road; upgrade programme

As of

The water tunnels at the top do not have public traffic lanes. Their length describes a water-conveyance route, which explains why they can greatly exceed the familiar transport tunnels without being places a traveller can drive through.

1. Delaware Aqueduct: approximately 137 kilometres

New York City’s Department of Environmental Protection gives the Delaware Aqueduct a length of 85 miles, equivalent to about 137 kilometres, and describes it as the world’s longest tunnel. It entered service in 1944 and moves water from reservoirs in the Catskill Mountains toward the city’s supply network. The named Delaware supply system should not be confused with the separate Catskill Aqueduct.

Its job is continuous bulk conveyance rather than moving individual vehicles. There is no need for a platform, carriage clearance or road junction inside the waterway. The engineering priorities instead include water pressure, the surrounding rock and keeping the conveyance system sound.

The city’s repair programme includes a 2.5-mile bypass beneath the Hudson River. That bypass is a component of a larger existing system, not an extra 2.5 miles to add indiscriminately to the record length. Construction progress and the date of connecting new works are also different milestones.

2. Paijanne Tunnel: Finland’s 120-kilometre water route

Helsinki Region Environmental Services gives the Paijanne Tunnel a length of 120 kilometres and commissioning year of 1982. It carries raw water from Lake Paijanne toward the Helsinki metropolitan area’s water system.

HSY places the tunnel approximately 30–100 metres below ground. Its intake draws from 25 metres below the lake surface, helping provide a comparatively cool water source throughout the year.

The water still needs treatment: a long underground conveyance route is not a replacement for a drinking-water treatment plant. The tunnel solves the problem of moving suitable raw water over distance, while the downstream system makes it ready for use.

3. Gotthard Base Tunnel: the longest operating railway tunnel

Switzerland’s transport department publishes 57.1 kilometres for Gotthard and dates its commissioning to 2016. Its portals are at Erstfeld and Bodio.

“Base tunnel” describes a route through the lower part of the mountain barrier. Instead of sending the railway high toward a pass, it provides a lower crossing that is particularly valuable to transalpine freight.

The railway still needs far more than an excavated opening. Track, electricity, signalling, drainage and emergency arrangements must function as one operating system. A tunnel can therefore be physically connected long before it is ready to carry a normal timetable.

For the distinction between operating and demonstration performance on railways, see the fastest trains.

4. Seikan Tunnel: 53.85 kilometres between Japan’s main islands

Japan’s Railway Construction, Transport and Technology Agency lists Seikan at 53.85 kilometres, with opening in 1988. It links Honshu and Hokkaido beneath the Tsugaru Strait.

Its published route diagram separates 23.3 kilometres beneath the sea from the landward underground sections. Calling the entire 53.85 kilometres “underwater” would therefore be inaccurate.

The structure includes a main railway tunnel, a service tunnel and a pilot tunnel. These have different functions within the project; adding their lengths would describe the amount of underground construction rather than the length of a journey through Seikan.

The agency also records the arrival of Shinkansen operation through the tunnel in 2016, a later milestone than its original opening.

5. Channel Tunnel: a longer undersea section

The Geological Society gives the Channel Tunnel’s total length as 50.5 kilometres. Getlink’s anniversary publication rounds it to 50 kilometres and dates inauguration to 6 May 1994. The published total is therefore about 50–50.5 kilometres, depending on precision.

The operator describes roughly 37 kilometres as undersea. The structure has two railway running tunnels and a smaller central service tunnel, rather than an ordinary public road beneath the Channel.

Cars and lorries are carried on rail shuttles. That arrangement keeps the vehicle journey inside a railway operating system; it does not mean drivers join a motorway at one portal and drive themselves through to the other.

The service tunnel also illustrates why a tunnel complex can have more underground passage than its headline route length.

6. Lotschberg Base Tunnel: 34.6 kilometres

BLS gives the Lotschberg Base Tunnel a route length of 34.6 kilometres and an opening year of 2007. It connects Frutigen with Raron and forms part of another major transalpine railway corridor.

The operator’s brochure gives a much greater total for tubes and connecting passages: 88.1 kilometres, or 91.8 kilometres with connecting tunnels under its stated accounting. Those are construction-system totals, not rival measurements of the main route.

This is a worked example of the counting problem. A passenger does not travel nearly 92 kilometres just because the entire underground project contains that much excavated passage. The main tunnel’s end-to-end figure remains 34.6 kilometres.

7. Laerdal Tunnel: 24.509 kilometres of road

Norway’s Public Roads Administration publishes 24,509 metres for Laerdal, generally rounded to 24.5 kilometres. It opened in November 2000 and forms part of the E16 road network.

The authority describes it as the world’s longest road tunnel. That is a road-traffic record, rather than a claim that no water or railway tunnel extends farther.

Its current project page describes an upgrade programme starting in 2026. The associated future opening date refers to the upgrade project, not to a claim that the original tunnel has never opened. Keeping those two events separate prevents a misleading status label.

Does the Brenner Base Tunnel beat Gotthard?

The Brenner project needs two lengths explained together. OBB describes 64 kilometres when the new tunnel is connected with the existing railway bypass south of Innsbruck. The newly built base-tunnel section itself is 55 kilometres.

BBT SE announced excavation breakthrough through the first continuous main railway tube on 25 August 2026. That is a substantial construction milestone, but not confirmation of commercial railway opening.

The distinction is simple: a connected underground route, a single newly built tunnel and the sum of all excavated passages are three different measurements. Brenner is discussed separately instead of being inserted into an operating-tunnel table before service begins.

Why long tunnels need more than a boring machine

Excavation creates space, but a useful tunnel must continue to work after the construction team leaves. Water has to be managed, equipment maintained and the intended traffic or flow controlled. Transport tunnels also need ways to respond when normal operation is interrupted.

Those requirements help explain parallel service passages and cross-connections. They may add heavily to the construction total while leaving the portal-to-portal distance unchanged.

The same measurement discipline applies above ground. The longest bridges separate overall structure length from main span, while the largest dams need a choice between height, stored water and generating capacity. A record becomes useful once its category and measuring method are clear.

For a closely related question, see The Tallest Buildings in the World.

Frequently asked questions

Is the longest tunnel a railway tunnel?

Not when water-supply tunnels are included: the Delaware Aqueduct is much longer than Gotthard. Gotthard holds the operating railway category rather than the all-purpose water-and-transport comparison.

Can you drive through the Channel Tunnel?

Road vehicles travel aboard rail shuttles rather than being driven along a public road through the tunnel. The tunnel's service passage is not an ordinary motorway.

Do two parallel tunnel tubes count as twice the length?

They increase the total length excavated, but not the distance a traveller covers between portals. A route-length comparison should not add parallel bores together.

Is the Brenner Base Tunnel open?

The cited 2026 project material records excavation progress rather than commercial opening. A breakthrough in one main tube is not equivalent to a finished, equipped railway in passenger service.

Why are railway base tunnels built so low?

They provide a lower route through the mountain barrier instead of climbing toward a high pass. A flatter alignment can make the crossing more useful for heavy freight as well as passenger trains.

Sources

  1. NYC DEP: Delaware Aqueduct repair project and 85-mile length
  2. NYC DEP: final phase of the Delaware Aqueduct repair project
  3. HSY: Paijanne water tunnel
  4. Swiss transport department: New Rail Link through the Alps
  5. JRTT: Seikan Tunnel
  6. Getlink: Channel Tunnel anniversary and opening
  7. Geological Society: Channel Tunnel engineering
  8. BLS: Lotschberg Base Tunnel technical brochure
  9. Norwegian Public Roads Administration: Laerdal Tunnel upgrade
  10. Brenner Base Tunnel: first continuous main tube breakthrough
  11. OBB: Brenner Base Tunnel and Innsbruck bypass